Courthouse Community UMC

10,324 SF

Virginia Beach, VA

2016

Arive created a master plan for CCUMC which included a reconfiguration plan for the Children’s wing and staff offices. Additionally, reconfiguration of the entry sequence to the sanctuary was studied and design for a new porte cochere was outlined. CCUMC proceed with a Phase 1 option that included reconfiguration of the Children’s wing. The project included relocation of walls, doors, and fixtures to better accommodate the population of the school facility and Children’s Ministry. The renovation also included increasing the size and number of toilet facilities to meet the required number of fixtures, as well as handicap accessibility codes for the entire facility.

/*
*/